Install Manual: Cheese Wall / Deli Wall
How to Install a Cheese Wall / Deli Door:
- Frame
- Doors
- Frame
- Doors
-
1General Safety & Precautions• Installers must familiarise themselves with Focus Install Manual requirements before installation.
• You should have received 2 crates.
• Please ensure nothing has been damaged in transit.
-
2Cut Out SizesPlease Note: Cut Out Sizes will be provided on your order confirmation as each item is custom made it order.
- Ensure opening in panel is square and level.
- There must be no more than 3mm deviation between parallel faces of cutout.
- The bottom edge of the cut out is set approximately 300mm from floor but this is dependant on client and site requirements.
- After cutting coolroom panel, the edges of cut panel must be capped and fixed with C channel (Not supplied). Capping channel must be installed level between inner and outer faces.
-
3Installling Frame
-
4Installing Doors
-
5You are All Done!Enjoy your new glass doors. If you have any further questions please reach out to our team.